EnergieTechnicsHonest adviceclear pricing

Have an EV charger installed from A to Z

From the connection on the board to the inspection, we take on the entire installation.

What can we help you with?

Rather speak to someone right away?0494 37 68 68

We only use your number to call you back. Privacy policy

Choose what you want to tackle. Several is fine.

Step 1 of 2

Want a more detailed answer? Take the EnergieUpgrade Scan

Installing a charging point is more than hanging a device on the wall. It is electrical work that must connect correctly to your distribution board, with the right protection, cable cross-section and fuse. As an executing installer, we carry out that work ourselves, so that the charging point functions safely and your installation remains compliant.

Having a charging point installed starts with good preparation. We examine your connection, measure the cable route and determine which charging capacity your installation can handle. Only then is the actual installation scheduled.

What is involved?

For an EV charger installation, we run a dedicated circuit from the distribution board to the charging point. That circuit gets its own circuit breaker and an RCD of the correct type, because an EV charger requires specific protection against DC leakage.

The cable runs via the shortest safe route to the charging point, in the appropriate cross-section for the chosen power rating and the distance. For an outdoor installation, we ensure weather-resistant wiring and a neat finish.

Electric car connected to a charging cable in autumn sunlight
Photo: Kindel Media / Pexels

Connection to the board

The distribution board is the heart of the installation. We check whether there is still space and capacity for an extra circuit, whether an upgrade is needed, and whether the board complies with current standards. Where necessary, we extend the board or propose an adjustment.

If you want to be able to manage things later with solar panels or stay within your available capacity, we immediately provide the cabling and metering required for that. That way you do not have to break things open again afterwards.

Inspection and handover

A new or modified electrical installation must be inspected. For your charging point circuit, that means an inspection by an approved inspection body. We deliver the installation ready for that inspection and help you with what is required for it.

After the installation, we test the operation, explain how to charge and go through the settings of the charging point, so that you get off to a good start straight away.

Urgent intervention

Urgent electrical problem?

Briefly describe what is going on. Call for an urgent intervention or leave your number and we will call you back as soon as possible.

  • Power failure
  • Short circuit
  • Fuse keeps tripping
  • East & West Flanders, Antwerp
Call for a callout0494 37 68 68

We only use your number to call you back. Privacy policy

How the installation proceeds

  1. 1

    Site visit

    We look at your connection, distribution board and cable route, and determine the achievable charging power.

  2. 2

    Tailored quote

    You receive a proposal covering the chosen unit, the connection and the work, with no surprises.

  3. 3

    Installation

    We lay the separate circuit, install the charging point and connect everything correctly to the panel.

  4. 4

    Test and inspection

    We test that it works and hand over the installation ready for the electrical inspection, with instructions on how to use it.

Frequently asked questions

Does an EV charger need to be inspected?
Yes. A new or modified electrical installation, and therefore also the circuit for your EV charger, must be checked by a recognised inspection body. We deliver the installation ready for inspection.
Can I install an EV charger myself?
Connecting to your distribution board is electrical work that must meet the standards and be inspected. So have the connection carried out by an installer, so that the installation is safe and in order.
How is the EV charger connected to my board?
Via a separate circuit with its own circuit breaker and an earth leakage circuit breaker of the correct type. That way, charging is separate from the rest of your home and your installation stays protected.
How long does the installation take?
That depends on the distance to the board, the cable route and whether any adjustments to the board are needed. After the site visit, we give a realistic estimate in the quote.

Ready to have your EV charger installed?

We take care of the full installation, from the circuit on your board to a handover ready for inspection. Request a site visit and quote.

Call Murat0494 37 68 68Request a quote